Solution scope
The “Mini-grids, hybridization and storage” solution is designed around actual site needs, users and the client’s operating capacity.
- Load forecast and growth scenarios
- Generation-storage-distribution architecture
- Dispatching and service-continuity strategy
- Metering, supervision and operating model
Possible deliverables
The scope is modular: study only, owner’s engineering, supply and installation, or full support through commissioning.
- Scoping note and assessment
- Sizing and technical package
- Budget, schedule and implementation plan
- Operations and maintenance procedures
- Team training and monitoring indicators
Quality and sustainability
KG3E prioritizes maintainable, documented and measurable solutions that match locally available technical resources.
