Inventory assets
Code, location, function, manufacturer, model, power, commissioning date and documentation form a minimum record.
Rank criticality
Safety, production impact, quality, environment, replacement lead time and cost provide an initial hierarchy.
Create basic routines
Inspections, cleaning, lubrication, tightening, periodic replacement and condition measurements can be structured from available recommendations.
Learn from interventions
Time spent, cause, part replaced and downtime feed the history that will make the plan more precise.